Northstar Roof WorksFree roof inspections for Stanton homeowners.Get my price

Note

What a roof quote should contain

The line items that separate a real quote from a number on headed paper.

Note1 min readStanton, CA

Get quotes instead

Three questions, up to three contractors, nothing charged.

Free · Up to three quotes

Get quotes instead

Three questions, up to three contractors, nothing charged.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Nothing is charged and nothing is booked.

A total is not a quote

A single figure tells you nothing about what you are buying. A quote worth comparing lists what is being removed, what is going on, and what happens when something unexpected turns up.

The lines to look for

Tear-off and how many layers. Decking replacement rate per sheet. Underlayment type and where ice-and-water goes. Drip edge. Valley treatment. Flashing — replaced or reused. Ventilation. Permit. Clean-up and disposal. Workmanship warranty and term.

Where quotes quietly diverge

Reused flashing, a thinner underlayment, no ventilation work and an open-ended decking charge will take thousands off a total without changing a single visible thing on the roof. That is where most of the spread between quotes lives.

The one clause people forget

The per-sheet decking rate. It is the only part of the job nobody can measure before the tear-off starts, and it is the reason fixed prices stop being fixed on the second morning.

Start with a free estimate

It is free, and nothing obliges you to hire anyone.