Guide
The maintenance that actually matters
Most of what shortens a roof is neglect of things that take twenty minutes: a blocked valley, a lifted flashing, a gutter full of grit.
Get it looked at
Three questions, and up to three Stanton contractors. Free either way.
Your request is in.
We are matching it now against roofing contractors working in Stanton and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
Twice a year, from the ground
Walk the perimeter with binoculars if you have them. You are looking for missing or lifted material, dark patches, sagging lines, and anything growing where it should not be. Ten minutes, twice a year.
Clear the gutters before the wet season
Gutters full of grit are not just a drainage problem — the grit is your roof, and its presence tells you something about how far along the covering is.
Keep the penetrations honest
Rubber pipe boots are the single most common source of leaks on an otherwise sound roof, and they are cheap to replace before they fail.
Cut back anything touching the roof
Branches abrade the surface in wind and drop debris that holds moisture. Keep growth well clear of the covering, and clear of the gutters while you are at it.
Deal with growth properly
Cleaning a roof aggressively does more damage than the growth was doing. Gentle treatment, patience, and a strip at the ridge to stop it returning.
Look in the attic after heavy weather
The attic shows a leak long before the ceiling does. After any serious storm, take a torch up and look at the underside of the deck around penetrations and valleys.
In short
Put two dates in the calendar, one either side of November through March. That is the whole programme.
Related questions
Why three quotes and not one?
Because one price tells you nothing. Three tells you where the middle is, and the outliers are informative in both directions — the very cheapest is usually leaving something out, and the most expensive should be able to say what you are getting for it.
I have solar panels. What happens to them?
Panels have to be detached and reset. Budget for it separately and coordinate the two trades. Never put a new solar array on a roof with under ten years left.
Are the contractors licensed and insured?
We require a licence number and current insurance from every contractor in the network. Verify it yourself anyway. Your state licensing board has a free lookup, and it takes two minutes.